Changes inside a house don’t usually need planning permission.
If the building is listed, internal changes need listed building consent.
In a flat, check the lease: alterations often need the freeholder’s consent.
An informed view of what’s likely, not a promise. The decision always rests with the council.
Other things to plan for
- 01
Load-bearing walls. Taking out or changing a load-bearing wall needs Building Regulations approval, with a structural engineer’s calculations. I bring the engineer in and manage their work for you.
- 02
Fire safety. Opening up rooms can change your escape route in a fire, especially in a house with a loft conversion.
- 03
Party walls. On a terrace or semi, the Party Wall etc. Act 1996 may apply if work is on or near a shared wall or boundary, or digs close to a neighbour’s foundations. Notices must go to the neighbours in good time before work starts.
- 04
Building Regulations. A separate approval from planning. It covers structure, fire safety, insulation, drainage and ventilation, and most extensions and structural alterations need it. I prepare the technical drawings.