Your home and what you want

I live in a flat.

More space in a flat: a ground-floor extension, a loft, or a new layout. Flats follow different planning rules, so it’s worth knowing them before you design.

Ask for a Scope

Start with your address.

Look it upCheck what applies at your postcode nowConservation areas, listed buildings, Article 4, flood zones and tree protection, from the national records.

01

A sample Scope

The sample Scope is for a ground-floor flat. It shows these rules in practice.

From the sample Scope · Your routes
  • Full planning application (flat or maisonette) Likely
  • Permitted development Not available
ReadSee a sample ScopeAll ten pages, from the cover to the sources.

02

Which route it needs

Flats and maisonettes don’t have the permitted development rights that houses have, so extensions and roof works need a full planning application.

As a flat, the owner’s lease and freeholder consent also need checking.

Changes inside a flat don’t usually need planning permission, but they may still need the freeholder’s consent and Building Regulations approval.

An informed view of what’s likely, not a promise. The decision always rests with the council.


03

Other things to plan for

  1. 01

    The lease. Check what the lease allows and who needs to agree before you spend money on design. Not sure who owns the freehold? HM Land Registry’s title register usually shows who owns it.

  2. 02

    Flood risk. On the ground floor in Flood Zones 2 and 3, a planning application needs a flood risk assessment, and new sleeping space needs particular care.

  3. 03

    Party walls. On a terrace or semi, the Party Wall etc. Act 1996 may apply if work is on or near a shared wall or boundary, or digs close to a neighbour’s foundations. Notices must go to the neighbours in good time before work starts.

  4. 04

    Building Regulations. A separate approval from planning. It covers structure, fire safety, insulation, drainage and ventilation, and most extensions and structural alterations need it. I prepare the technical drawings.


04

What I do

  1. 01

    A Scope for a flat. Flats follow different planning rules, and the lease matters too. The Scope covers both.

  2. 02

    Drawings and planning. Measured survey, design options, then planning drawings. I prepare and submit the application, and deal with the council.

A few projects at a time.

I keep PlotScope small so every project gets my full attention. Tell me about your home and I’ll come back to you personally.

A Scope is a fixed fee, confirmed before you commit. I read every request myself and reply within two working days. If you go ahead with drawings within 6 months, the Scope fee comes off the drawings fee.

Adam Davis · Architectural Technologist, BSc (Hons) First Class, UWE Bristol

Where are you starting from?

Also true for you? (optional)

More details (optional) the kind of project, where you are with it, a phone number, photos
What kind of project?
Where are you with it?
Photos

A few photos of the part of your home you’d like to change help me reply properly. Up to three.